-  
 - Engineering Step-by-Step
 - Other Applications
 - Energy Reporting
 - Configuring and Scheduling Energy Reports
 - Create a Link for the Report to be Executed
 
Create a Link for the Report to be Executed
- In System Browser, select the view with the hierarchical structure of the building with floors, and managed meters installed on the floors.
 
 
- Select the building, floor, or managed meter for which you want to generate an energy report.
 
 
 
- Select the report (for example, Consumption, Load Profile, or Max Power) that you want to schedule.
 
 
- Click Save As 
. 
 
- In the Save As dialog box, enter the destination for saving the link.
 
   
- The saved link displays in the Applications > Links folder.