1. Operating Step-by-Step
  2. Subsystem Operations
  3. SPC

SPC

This section provides operator instructions relating to SPC intrusion panels.

 

Prerequisites

  • Desigo CC is configured to integrate an SPC intrusion system.
  • System Browser is in Management View.

 

  • Acknowledge or Reset an SPC Zone
  • Acknowledge an SPC Door
  • Acknowledge or Reset an SPC Panel
  • Handle SPC Intrusion Events in Event List
  • Check an SPC Panic Alarm
  • Arm or Disarm an SPC Intrusion Area
  • Inhibit or Isolate an SPC Zone
  • SPC Get Status - Single Read of Active Inputs
  • SPC Ready to Arm - Continuous Monitoring of Active Inputs

  • Menu
  • Home
  • Language
  • english
  • Home